About the project
This 1,000+ acre facility contains six liquefaction units, or trains, with a total capacity of ~30 million tonnes per annum.
The first two LNG trains were completed in 2016. Trains 3 and 4 were completed in 2017 and Train 5 in 2019. The sixth train and third berth at SPL were completed in 2022 ahead of schedule and within budget.
The operating facility at a glance:
Six trains with total capacity of ~30 million tonnes per annum
Five storage tanks each capable of holding 3.4 billion cubic feet of LNG
Three LNG tanker berths